Skip to main content

Science – Society – Technology

Table 4 Operation time and COP of BHE

From: Operational strategies to alleviate thermal impacts of the large-scale borehole heat exchanger array in Beijing Daxing Airport

Season

Date

COP

Specific thermal load of the Northern district (W/m)

Specific thermal load of the Southern district (W/m)

Heating period

Nov. 12–Mar. 14 (123 days)

5.31

− 17.59

− 24.15

Cooling period

May 15–Sep. 15 (124 days)

4.40

16.76

22.70