Fig. 3From: Comparison and integration of simulation models for horizontal connection pipes in geothermal bore fieldsVerification of the pipe model implementation: transient case with the temperature front at the middle of a 50m long pipe (left) and steady state case with fully flown through pipe (right)Back to article page