Skip to main content

Science – Society – Technology

Table 2 Validation results of Kamojang GPP Units 2 and 3

From: Thermal modeling and simulation of a single-flash geothermal power plant involving non-condensable gas: a case study of Kamojang geothermal field in Garut, West Java, Indonesia

Specification

Unit

Component

Design data

Ejector model

Hybrid model

Rated capacity

kW

Turbine

55000

55295

55413

Steam flowrate

kg/h

376580

378468

379260

Inlet cooling water mass flow rate

kg/h

Inter-condenser

150000

150588

152316

Outlet condensate mass flow rate

kg/h

156419

156852

157860

Inlet cooling water mass flow rate

kg/h

After-condenser

150000

150948

152460

Outlet condensate mass flow rate

kg/h

155542

156672

158940

Inlet cooling water mass flow rate

kg/h

Condenser

12488135

12477600

12574800

Outlet condensate mass flow rate

kg/h

1300000

13168800

13287600

Enthalpy

kJ/kg

2218.6

2218

2218

Inlet cooling water mass flow rate

kg/h

Cooling tower

13200000

13100400

13302000

Suction steam rate

kg/h

Ejector 1

5900

5940

5148

Suction steam rate

kg/h

Ejector 2

4560

4535

6516

MCWP power

kW

MCWP

860

916

1044