Fig. 6From: Thermal modeling and simulation of a single-flash geothermal power plant involving non-condensable gas: a case study of Kamojang geothermal field in Garut, West Java, IndonesiaThe turbine expansion flow process. Steam from the demister (state 7) is used for the turbine and the steam ejectors of the first (state 11) second (state 10) stagesBack to article page