Fig. 3From: Monitoring of a reverse cement job in a high-temperature geothermal environmentTwo consecutive cement bond logs after the end of the cementing operation. CBL1: September 6th after 14–21 h curing. CBL2: September 7th 33-40 h curing. A well completion schematic with the caliper log is shown next to the CBL data. Depth reference is surface. Figure modified from (Stefánsson et al. 2020)Back to article page