Fig. 9From: Hydrochemical and operational parameters driving carbonate scale kinetics at geothermal facilities in the Bavarian Molasse BasinLeft: Schematic drawing of production side at site 6 (not to scale). Middle: Scale rate in the casing (black line) of that site calculated from MFC measurements in 2010 and 2015 with measurements available only below water level. The scale rate in the production pipe (blue and green line) was determined from three time periods. Right: Modeled scale rate based on the regression in Figure 4 bBack to article page