Table 2 Summary of the results of hydrogeological tests conducted in the Biały Dunajec PAN-1 well after its reconstruction in 2015 (Bujakowski et al. 2015)

From: Reconstruction of geothermal boreholes in Poland

Step

Flow rate (m3/h)

Pressure at the wellhead in the final phase of the step (bar)

Time (hh:mm)

Preliminary injectivity test

 I

31.0

20.8

01:00

 II

100.0

23.9

00:55

 III

131.0

26.7

00:30

General injectivity test

 I

189.0

30.8

00:50

 II

280.0

45.0

01:30

 III

363.0

59.0

02:40

Hydrodynamic (pressure buildup) test

 I

96.0

17.4

02:10

 Pressure buildup after I step

0.0

19.5

01:15

 II

168.0

12.5

02:00

 Pressure buildup after II step

0.0

19.5

01:15

 III

240.0

4.3

01:00

 Pressure buildup after III step

0.0

19.5

01:00