Skip to main content

Science – Society – Technology

Table 3 Actual vs proposed casing setting depth

From: Casing failure identification of long-abandoned geothermal wells in Field Dieng, Indonesia

Section

Well HCE9B

Well HCE28B

Actual (m TVD)

Proposed (m TVD)

Actual (m TVD)

Proposed (m TVD)

Surface casing shoe (508 mm)

454

450

440

450

Production casing shoe (339.7 mm)

1519

1250

1504

1400