Skip to main content

Science – Society – Technology

Table 6 Parameters defining the capital and current costs of the district heating supply

From: Techno-economic and environmental analysis of an Aquifer Thermal Energy Storage (ATES) in Germany

Category

Parameter

Minimum

Mode

Maximum

Capital costs CDH

Excavation work (€/m)

101.15a

113.05

124.95b

Piping (€/m)

232.05b

431.40

630.70c

Contingency (%)

 

10d

 
  

Karlsruhee

Ulmf

Pforzheimg

Emmendingenh

Current costs

Commodity price CP (ct/kWh)

5.87

5.90

8.96

8.94

Power price PP (€/kW)

35.16

50.54

18.72

23.80

Basic price BP (€)

191.00

558.00

–

257.04

Efficiency for consumer ηDH (%)i

98

Maintenance (%)j

1

  1. aStadtwerke Sindelfingen (2007), b(2018), cStadtwerke Waldkraiburg (2018), dHallamICS (2012), eStadtwerke Karlsruhe (2018), f Stadtwerke Ulm (2018), gStadtwerke Pforzheim (2019), hStadtwerke Emmendingen (2019b), iGudmundsson et al. (2013), jKonstantin (2017)