Table 2 Status of geothermal projects.

From: Analysis of geothermal energy as an alternative source for electricity in Colombia

Project

Estimated capacity

Current status

Nevado del Ruiz Volcanic Mountain

50 MW

Pre-feasibility studies complete

Bi-national project: Chiles-Tufiño-Cerro Negro

138 MW

Pre-feasibility studies in progress

Paipa

NA

Pre-feasibility studies SGC

Azufral volcano

NA

Pre-feasibility studies SGC

San Diego maar

NA

Pre-feasibility studies SGC