Table 3 Configuration specification dialog for the geothermal well

From: Performance of geothermal power plants (single, dual, and binary) to compensate for LHC-CERN power consumption: comparative study

Total production wells required

% of confirmation wells used for production

Number of confirmation wells

Number of production wells to be drilled

Ratio of injection wells to production wells

Number of injection wells to be drilled

5.33897

50

1

4.33897

0.5

2.66949

Drilling and associated costs

Cost multiplier

Cost per well (USD)

Number of wells

Drilling cost (USD)

Non-drilling cost (USD)

Total cost (USD)

Exploration

0.5

770,910

2

1,541,819

750,000

2,291,820

Confirmation

1.2

1,850,183

2

3,700,367

250,000

3,950,367

Production

Med

1,541,819

4.33897

6,689,914

–

–

Injection

Med

1,541,819

2.66949

4,115,867

–

–

Surface equipment, installation

–

125,000

8.00846

–

1,001,058

1,001,058

Simulation cost

–

1,000,000

8.00846

–

8,008,460

8,008,460

Production and injection wells to be drilled

–

–

7.00846

10,805,780

250,000

11,055,780

Gross plant output

23,357.283 kW

     

Cost

1800$/kW

     

Power plant cost

42,043,108$

     

Pump installation and casing cost

50$/ft

Pump depth

2,859.928 ft

Total cost

142,996.4$

 

Pump cost

12,479.2$/hp

Pump size

1345.62 hp

Total cost

457,771$

 

Number of pumps required

5.33897

Cost of pump

600,767$

Total cost

3,207,481$